2012 QCLNG Pipeline Project – Queensland Australia
QCLNG is a 556km-long onshore pipeline project operated by APA Group. This gas pipeline, with a maximum diameter of 42 inches, starts near Dalby in Queensland (Australia) and ends in Gladstone Queensland (Australia).
The QCLNG project started operations in 2013 and is owned by APA Group.
Now called the The Wallumbilla Gladstone Pipeline, WGP is a 543km transmission pipeline that operates across central Queensland. It connects gas fields in Queensland's Surat Basin and APA’s East Coast Grid to the Queensland Curtis LNG (QCLNG) export facility on Curtis Island, near Gladstone. It also has interconnections with the Australia Pacific LNG and Gladstone LNG transmission pipelines.
The WGP is owned and operated by APA Group. Formerly known as the Queensland Curtis LNG Pipeline (QCLNG), construction of the pipeline was completed in 2014 and it was owned by QGC until 2015 when it was sold to APA Group.